Role of the School Custodian
Your school Custodial Engineer’s primary responsibility is to ensure your school building is ready for occupancy on a daily basis. Custodial Engineers are responsible for day to day custodial & maintenance operations for their schools (HVAC, fire prevention systems, daily cleaning, outside grounds, emergencies, budgets, supplies, supervision of custodial staff).
Since Custodial Engineers report to, and are rated by, school Principals, they should meet on daily basis to discuss building issues & set schedule to tour school building together to ensure cleaning & maintenance standards are met.
Your Deputy Director of Facilities performs managerial oversight at a district level of day-to-day custodial operations including skilled trades/contract work & capital work performed by School Construction Authority (SCA). They are a resource for you in helping maintain a clean and safe school environment.
Custodial Engineer’s Responsibilities
- Order necessary supplies in order to clean and maintain the school properly
- Responsible for the school building(s) at all times and must respond to all emergencies
- Ensure that the entire school environment is safe and clean at all times
- Responsible for assigning a suitable alternate in their absence
- Works under a performance-based contract
- Responsible for minor repairs
- Responsible for creating work order requests based on the needs of the school
- Custodians are responsible for scheduling and entering employee time keeping through ADP Vantage.
- Possible shifts for a Custodial Engineer
- 6am to 3pm
- 7am to 4pm
- 8am to 5pm
- 9am to 6pm
Custodial Employees
Custodial Engineers employ a team that reports directly to the school Custodial Engineer.
- School Stationary Engineer
- School Fireperson
- School Handyperson
- School Cleaner
Custodial Budget
School Building Allocations are based on square footage
- Custodial budgets are maintained and managed in MyGalaxy. Custodians have a MyGalaxy account to review and manage their budgets.
- Custodian’s salaries are based on square footage.
- Custodial budgets may include emergency and activity funding according to the specific site.
- Custodians also receive a separate supply and toolbox allocation.
Role of the Principal in Building Management
- Day-to-day supervision of the school’s custodial engineer
- Annual rating of the Custodial Engineer’s performance
- Maintain awareness of when Custodial Engineer is in and out of the building during working hours
- Sign off on Custodial Engineer’s timesheet
- Escalate facilities issues or concerns to the Custodial Engineer and the assigned Deputy Director of Facilities
Division of School Facilities
School Stat
Conducts periodic, non-technical, visual inspections of NYC school buildings focusing on cleanliness, repair and fixture deficiencies
Scores are assigned to each condition to determine target areas that require special attention and corrective action
Sustainability
- Integration of sustainability in operations, facilities & education at all DOE schools in accordance w/Chancellor’s Regulation A-850 & goals (Carbon neutrality by 2050, Zero waste by 2030)
Provides variety of programs, trainings, workshops, events & professional learning opportunities for school stakeholders, teachers, Sustainability coordinators, students, administrators, Office of Food & Nutrition Services (OFNS) staff & custodial staff
Emergency Preparedness
Monitors citywide events for any potential impact on schools & disseminates information to appropriate parties
Environmental Health & Safety
Monitors environmental conditions in schools
- Coordinates appropriate responses to potentially harmful situations (i.e., asbestos, lead paint, drinking water quality, air quality, mold, dust conditions)
- Tests, remedies & corrects situations involving suspected exposure to potential hazardous substances
COVID-19 Response
COVID-19 Response and Use of DOE Space
Outdoor Yard Space
- Partnership w/Department of Parks & Recreation
- 268 playgrounds currently in the program
- Playgrounds available to communities from 8AM to dusk when school is not in session (weekdays, weekends & holidays)
- AKA PlaNYC with goal of bringing all New Yorkers within a 10 minute, ¼ mile walk of a park by 2030
- School receives funding to operate & maintain the playground
Improvement Projects
General Maintenance
General maintenance work for a school building can be performed by the school’s Custodial Engineer in consultation with the assigned Deputy Director of Facilities. General maintenance includes the day-to-day operations of the facility and repair or replacement of equipment due to normal wear and tear of the operating components of the building’s facility and grounds.
This type of work is funded by the Division of School Facilities at no cost to the school.
Improvement Projects (Market Maker)
Schools may opt to fund additional work beyond the scope of general maintenance. Initiate this request with your school custodial engineer and Deputy Director of Facilities.
After the work has been completed, the contract manager approves the vendor’s application for payment and pays the vendor using the funds provided to DSF by the school through its Purchase Order to DSF.
Third-Party Requests
- Work will be done by contractor selected by school/organization where contractor does not have direct contract w/DSF
- Requested work to be entered in Third Party Portal for review & appropriate approvals
- Funded by school or organization (i.e. Parents Association or non-profit, etc.)
Building Improvement Projects page
Systems
Building Management
Custodial Rating System
- Custodial Rating Application for Custodian Engineers & Building Managers (PDF)
- Custodial Rating Application for DDFs (PDF)
- Custodial Rating Application for Principals (PDF)
- Building Manager Service Rating Sample (PDF)
- Custodial Service Rating Sample (PDF)
Recycling Plan Application
Chancellor's Regulations Related to School Buildings
A-415 DOE Emergency Notification System
English, Spanish, Chinese, Bengali, Russian, Urdu, Arabic, Haitian Creole, Korean, French
A-640 Filming at School Facilities
A-850 Sustainability
English, Spanish, Chinese, Bengali, Russian, Urdu, Arabic, Haitian Creole, Korean, French
A-860 Naming And Renaming A New York City Public School or A Particular Area Within A New York City Public School
English, Spanish, Chinese, Bengali, Russian, Urdu, Arabic, Haitian Creole, Korean, French
C-810 Smoke-Free Environment Policy
D-130 Use of School Buildings by Candidates, Elected Officials and Political Organizations, and Conduct of School Employees and Officers with Respect to Political Campaigns and Elections
D-180 Extended Use of School Buildings
Custodial Circulars
Circular No. | Subject | Date Issued |
---|---|---|
2 - 2023/24 | Fuel Oil Operational Procedures | 09/19/2023 |
1 - 2023/24 | Waste Collection Program | 09/06/2023 |
8 - 2022/23 | FY 2023 Year-End Adjustments | 06/28/2023 |
7 - 2022/23 | Submission Schedule | 06/27/2023 |
6 - 2022/23 | Custodial Supply Program | 06/27/2023 |
5 - 2022/23 | Vacancies | 03/31/2023 |
4 - 2022/23 | Proper Disposal of Leftover Paint | 03/15/2023 |
3 - 2022/23 | Vacancies | 10/28/2022 |
2 - 2022/23 | 2022-23 SCHOOL YEAR RE-OPENING CIRCULAR | 9/1/2022 |
1 - 2022/23 | Cleaning and Disinfection Guidance During the Current Monkeypox Outbreak | 9/1/2022 |
10 - 2021/22 | FISCAL YEAR 2022 YEAR-END ADJUSTMENTS | 6/29/2022 |
9 - 2021/22 | FISCAL YEAR 2023 SUBMISSION SCHEDULE | 6/29/2022 |
8 - 2021/22 | FISCAL YEAR 2023 CUSTODIAL SUPPLY PROGRAM | 6/29/2022 |
7 - 2021/22 | CIRCULAR NO. 7 - 2021/22 Inspection card for Sprinkler & Standpipe Systems and Emergency Shower & Eyewash Stations | 5/25/2022 |
6 - 2021/22 | Travel and Reimbursable Expenditure form CV-2 | 4/13/2022 |
5 - 2021/22 | ADDENDUM TO BUILDING SERVICES CIRCULAR NO. 5 - 2021/22 | 3/24/2022 |
5 - 2021/22 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 5 – 2021/22 | 3/18/2022 |
5 - 2020/21 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 5 – 2020/21 | 3/18/2022 |
4 - 2021/22 | VACANCIES | 10/29/2021 |
3 - 2021/22 | Standard Operating Procedures for Dust Mitigation | 10/18/2021 |
2 - 2021/22 | Water Flushing Protocol | 10/14/2021 |
1 - 2021/22 | 2021-22 SCHOOL YEAR RE-OPENING CIRCULAR | 8/31/2021 |
8 - 2020/21 | FY 2021 YEAR-END ADJUSTMENTS | 6/29/2021 |
7 - 2020/21 | FISCAL YEAR 2022 SUBMISSION SCHEDULE | 6/29/2021 |
6 - 2020/21 | FY 2022 CUSTODIAL SUPPLY PROGRAM | 6/29/2021 |
4 – 2020/21 | Vacancies Announcement, Application for Transfer | 10/30/2020 |
3 - 2020/21 | Personal Protective Equipment (PPE) Distribution Program | 10/9/2020 |
2 – 2020/21 | Building Ventilation and Domestic Water System Readiness | 9/25/2020 |
1 – 2020/21 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 1 – 2020/21 | 8/25/2020 |
6– 2019/20 | FY 2020 YEAR-END ADJUSTMENTS | 6/29/2020 |
5– 2019/20 | FISCAL YEAR 2021 SUBMISSION SCHEDULE | 6/29/2020 |
4– 2019/20 | FY 2021 CUSTODIAL SUPPLY PROGRAM | 6/29/2020 |
3 - 2019/2020 | OPERATION AND MAINTENANCE PROCEDURES (O&M) OFDETERIORATED LEAD-BASED PAINT | 10/19/2021 |
2 – 2019/20 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 2 – 2019/20 | 10/9/2019 |
1-2019/20 | Office of Building Services Circular NO. 1-2019/20 | 8/23/2019 |
4 - 2018/19 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 4 – 2018/19 | 6/27/2019 |
3 - 2018/19 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 3 – 2018/19 | 6/27/2019 |
2 - 2018/19 | ADDENDUM TO BUILDING SERVICES CIRCULAR NO. 2 – 2018/19 | 4/29/2019 |
1-2018/19 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 1 – 2018/19 | 10/18/2018 |
7 - 2017/18 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 7 - 2017/18 | 6/28/2018 |
6 - 2017/18 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 6 - 2017/18 | 6/28/2018 |
5-2017/18 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 5 – 2017/18 | 6/27/2018 |
4-2017/18 | Fiscal Year 2019 Custodial Operating Building Budgets | 6/20/2018 |
3 – 2017/18 | OFFICE OF BUILDING SERVICES CIRCULAR NO. 3 – 2017/18 | 4/19/2018 |
2–2017/18 | Modification of Current Custodial Spending Patterns | 3/20/2018 |
1-2017/18 | Vacancies Announcement, Application & Addendum | 9/7/2017 |
9 - 2016/17 | FY 2018 Custodial Supply Program | 6/28/2017 |
8 - 2016/17 | FY 2018 Submission Schedule | 6/27/2017 |
7 - 2016/17 | 2017 Fiscal Year End Adjustment (Addendum) | 6/27/2017 |
7 - 2016/17 | 2017 Fiscal Year End Adjustment | 6/27/2017 |
6-2016/2017 | Vacancies Announcement, Application & Addendum | 4/20/2017 |
5 – 2016/17 | Closing of HSBC Accounts | 3/20/2017 |
2016/17 Addendums attached to Building Services Circular 4-2010/11 | Addendum to Building Services Circular NO. 4-2010/11 | 1/17/2017 |
4 -2016/17 | Circular No. 4 – 2016-17 | 11/30/2016 |
3-2016/17 | Vacancies Announcement, Application & Addendum | 10/6/2016 |
2-2016/17 | Vacancies Announcement, Application & Addendum | 9/9/2016 |
1–2016/17 | Custodial Employee Transition to NYC School Support Services, Inc | 8/11/2016 |
9-2015/16 | Cancellation of New York State Insurance Fund Workers’ Compensation Accounts | 6/28/2016 |
8-2015/16 | Hourly Wage Rate for Newly Hired Local 32BJ Cleaners | 6/28/2016 |
7-2015/16 | Total FY 2017 Supply Allocation (Includes Toolbox) | 6/30/2016 |
6-2015/16 | Employment Transitioning of Custodial Employees | 6/22/2016 |
5-2015/16 | Amendment to dust mop service expenditure and PO1/PO2 procedures after separation from DOE service | 1/29/2016 |
3-2015/16 | YEAR-END ADJUSTMENT OF COMPENSATION | 12/3/2015 |
4-2015/16 | P.O. #2 YEAR-END GUIDELINES | 12/3/2015 |
2 – 2015/16 | Vacancies Announcement, Application & Addendum | 10/22/2015 |
1-2015/16 | Office of Building Services Circular | 7/2/2015 |
5 – 2014/15 | Vacancies Announcement, Application & Addendum | 5/7/2015 |
4 -2014/15 | Vacancies Announcement, Application & Addendum | 2/12/2015 |
3 - 2014/15 | P.O. #2 YEAR-END GUIDELINES | 12/8/2014 |
2 - 2014/15 | YEAR-END ADJUSTMENT OF COMPENSATION | 12/5/2014 |
1A - 2014/15 | ADDENDUM TO BLDG SERVICES CIRCULAR NO. 1 - 2014/15 | 10/17/2014 |
1 - 2014/15 | Vacancies Announcement, Application & Addendum | 10/14/2014 |
6 – 2013/14 | FY 2015 CUSTODIAL SUPPLY PROGRAM | 6/19/2014 |
5 - 2013/14 | Vacancies Announcement & Addendum | 3/20/2014 |
4 - 2013/14 | P.O. #2 YEAR-END GUIDELINES | 12/11/2013 |
3 - 2013/14 | YEAR-END ADJUSTMENT OF COMPENSATION | 12/10/2013 |
2 - 2013/14 | FUEL OIL – OPERATIONAL PROCEDURES | 10/10/2013 |
2 - 2011/12 | NYC SAFE HANDLING OF UNIVERSAL & ELECTRONIC WASTE | 6/18/2013 |
4 - 2012/13 | Vacancies Announcement, Application & Addendum | 3/28/2013 |
3 - 2012/13 | P.O. #2 YEAR-END GUIDELINES | 12/10/2012 |
2 - 2012/13 | Year End Adjustment of Compensation | 12/9/2012 |
1 - 2012/13 | Vacancies Announcement, Application & Addendum | 10/5/2012 |
7 - 2011/12 | CUSTODIAL SUPPLY PROGRAM | 9/25/2012 |
6 - 2011/12 | PCB Caulk Best Management Practices for NYC School | 5/3/2012 |
5 - 2011/12 | Vacancies Announcement | 2/22/2012 |
4 - 2011/12 | P.O. #2 YEAR-END GUIDELINES | 12/8/2011 |
3 - 2011/12 | YEAR-END ADJUSTMENT OF COMPENSATION | 12/7/2011 |
2 – 2011/12 | NYC Safe Handling of Universal & Electronic Waste | 8/31/2011 |
2 - 2011/12a | NYC Safe Handling of Universal & Electronic Waste | 8/31/2011 |
2 - 2011/12b | Universal Waste Label for Batteries & Mercury Cont | 8/31/2011 |
1 - 2011/12 | Vacancies Announcement and Application | 8/18/2011 |
6–2010/11 | Custodial Supply Program | 6/22/2011 |
5-2010/11 | Reduction of Custodial Building Allocations | 6/16/2011 |
4-2010/11 | T-12 Ballast Inspection Protocol | 4/11/2011 |
7-2009/10 | Vacancies Announcement and Application | 4/16/2010 |
3-2009/10 | FDNY Interior fire alarm C OF F code changes | 12/11/2009 |
4-2009/10 | Year End Adjustment of Compensation | 12/11/2009 |
5-2009/10 | P.O. #2 Year-end guidlines | 12/11/2009 |
6-2009/10 | Reduction of Custodial Building Allocations | 12/11/2009 |
1-2009/10 | Reduction in Maintenance Painting Allowance | 8/12/2009 |
2 - 2008/09 | Year end adjustment of compensation | 12/11/2008 |
3 - 2008/09 | PO2 year end guidelines and schedule of compensati | 12/11/2008 |
7 - 2001-02 | Standard Operating Procedure Manual for Purchasing | 11/17/2008 |
7 - 2007/8 | Reductions in Custodial Building Allocations & Eme | 7/8/2008 |
6 - 2007/08 | Custodial Supply Program FY08-09 | 7/7/2008 |
7 – 2006/07 | Custodial Supply Program FY07-08 | 6/27/2008 |
5 - 2007/08 | Polychlorinated Biphenyls PCBs | 5/23/2008 |
5.1 - 2007/08 | Monthly Building Caulking Inspection Form | 5/23/2008 |
1.1 - 2007/08 | Vacancies (Addendum) | 10/9/2007 |
1 - 2007/08 | Vacancies | 10/4/2007 |
3-1997/98 | Correct Use and Display of the Flag of The United | 12/20/2006 |
4-2006/07 | Year End Adjustment of Compensation | 12/14/2006 |
5-2006/07 | P.O.#2 Year End Guidelines | 12/14/2006 |
3-2006/07 | Light Bulb Recycling Program plus Attachments | 11/2/2006 |
1-2006/07 | Vancancies Circular #1 2006-07 | 10/6/2006 |
1-2006-07-addendum | Addendum to Vacancies Circular #1 2006-07 | 10/6/2006 |
2-2006/07 | Reduction In Custodial Building Allocation | 10/5/2006 |
13 - 1999/00 | Fingerprinting / Chancellor's Regulation C-105 / A | 7/18/2006 |
7 - 2005/06 | Custodial Supply Program | 6/15/2006 |
6 - 2005/06 | Vacancies | 3/23/2006 |
5 – 2005/06 | P.0. #2 Year-End Guidelines | 12/15/2005 |
4 - 2005/06 | Year End Adjustment of Compensation | 12/15/2005 |
3 - 2005/06 | Changes To Emergency Notification System and Emerg | 12/15/2005 |
6 - 2004/05 | Fire Extinguisher Inspection/Certification | 3/25/2005 |
4 – 2004/05 | Vacancies | 12/17/2004 |
3 – 2004/05 | Year-End Adjustment of Compensation | 12/16/2004 |
2 – 2004/05 | P.O. #2 Year-End guidelines / Schedule of compensa | 12/15/2004 |
1 – 2004/05 | Custodial supply program | 7/1/2004 |
8 – 2003/04 | Con Edison meter reading schedule | 2/12/2004 |
7 – 2003/04 | Year-End Adjustment of compensation | 12/18/2003 |
6 – 2003/04 | P.O. #2 Year-End Guidelines | 12/17/2003 |
5 – 2003/04 | P.O. #18 Submissions | 12/3/2003 |
4 – 2003/04 | Ordering Fuel | 11/20/2003 |
3 – 2003/04 | Work Request Procedures | 10/23/2003 |
2 – 2003/04 | Reduction in building allocations | 10/9/2003 |
1 – 2003/04 | Custodial Supply Programs | 7/3/2003 |
11 - 2002/03 | Air Conditioners / Maintainance Checks / Summer En | 5/22/2003 |
10 - 2002/2003 | Window Belts and Window Anchor Bolts / Dust Contro | 4/10/2003 |
8 - 2001/02 | Daily Fire Safety Inspections | 2/27/2002 |
25 - 2000/01 | Fire Safety - Combined Circulars | 6/21/2001 |
3 - 2000/01 | Fire Safety Guidelines | 8/29/2000 |
20 - 2000/01 | Custodian Engineer Responsibility For Fire Safety | 4/5/2000 |
15 - 1998/99 | Control Valves For Sprinkler And/Or Standpipe Syst | 1/7/1999 |
15 - 1996/97 | Building Safety Check/Energy Sign-In Sheets/Arrest | 1/27/1997 |
14 - 1995/96 | Cleaning/Testing & Documentation Requirements For | 12/11/1995 |
17 - 1990/91 | Fire Drills/Fire Safety/Shelter Drills/Suggested P | 10/17/1990 |
29 - 1988/89 | City-Wide Policy Concerning Locking of Exits | 12/12/1988 |
Buildings and Contacts
Use the Buildings and Contacts Lookup application to search for contacts.